37610 Sky Canyon Dr Hgr 51 Murrieta, CA 92563

(951) 677-0085 info@aieinc.com

ADS-B Facilities VS. Installation Ability

More than 130,000 Aircraft Need ADS-B Compliance…

Chart (2)

With as few as 500 avionics facilities in the US, waiting until the last minute to comply with the FAA’s mandate requiring ADS-B Output will leave a lot of aircraft owners grounded and waiting in long lines.

On average, along with their normal workload, each of these facilities can install and certify ADS-B on 4 aircraft per month for a maximum total of 2000 installs per month.  With only 36 months remaining until the mandate deadline, the avionics industry has the capacity to install ADS-B on 72,000 aircraft before the deadline.

AIE's website is under maintenance. Please call 951-677-0085 Dismiss